Investor report · Great North Road, Chisamba, Zambia
A 4.87-hectare roadside plot on the Great North Road, planned as a Novea Energies fuel stop with secure parking for 91 trucks, a mini mart, a workshop and wash bays. Kokeb Enterprises Limited is seeking partners to build it.
The opportunity
The Great North Road carries Zambia's traffic between Lusaka and the Copperbelt and on to the Congo border. Trucks on it need fuel, a safe place to stop overnight, food, tyres and a wash. This site offers all five on one plot that Kokeb already holds.
Zambia used 1.85 billion litres of diesel and 664 million litres of petrol in 2025, up 12% and 11% on 2024.1
The 327 km Lusaka to Ndola road is being rebuilt as a dual carriageway under a US$650 million public-private partnership. Works were reported about 84% complete in July 2026.4
Copper output reached 890,346 tonnes in 2025, up 8%, against a government target of 3 million tonnes a year by 2031.8
A Novea Energies forecourt with three pump islands and six lanes, wide and high enough for trucks. Behind it sit a 525 m² mini mart with coffee shop and bar, a repair and tyre shop, four wash bays and a fenced park for 91 trucks. About 1.1 hectares at the back of the plot stays free for a later phase.
Capital and partners to build and operate the site. Kokeb is open to equity, to debt or project finance, and to a joint venture or operating partner for parts of the site. No structure is fixed. Kokeb brings the land, the design, its own construction capacity, the Novea brand and fuel supply.
Location
The plot fronts the Great North Road (T2) at Chisamba in Central Province. The T2 is the trunk road from Lusaka to Kabwe and Kapiri Mposhi, where it meets the road to Ndola, Kitwe and the Kasumbalesa border with the Democratic Republic of Congo.
Freight from South Africa, Zimbabwe, Botswana and Namibia reaches the Copperbelt and the Congo through Lusaka and this road. Freight from Dar es Salaam joins further north, at Kapiri Mposhi.
The plot lies on the east side of the road, which on a dual carriageway is the southbound side, used by traffic heading for Lusaka. See the first point under Risks.
The site and the concept
The plot measures 342.1 m by 145.04 m. The forecourt, shop and workshop face the road. The truck park fills the middle of the plot, and the eastern end is kept for expansion.
Swipe the plan sideways to see all of it.
| Element | Size | Area or number |
|---|---|---|
| Plot | 342.1 × 145.04 m | 4.87 ha |
| Fuel canopy | 10 × 28 m, clear height 5.6 m | 3 islands, 6 lanes |
| Mini mart, coffee shop and bar | 15 × 35 m | 525 m² |
| Repair and tyre shop | 12 × 22 m | 264 m² |
| Wash bays | 5 × 22 m each | 4 |
| Truck parking bays | 80 at 5 × 22 m, 11 at 5 × 18 m | 91 |
| Paved area, including buildings | about 2.55 ha | |
| Landscaped areas | about 1.0 ha | |
| Expansion land at the eastern end | about 1.1 ha |
Renderings are artist's impressions prepared from the 3D model. Building heights, finishes, signage, fencing and vehicles are indicative.
3D model
The model is built to scale from the layout plan. Choose a view, or press Explore and drag to look around.
This is a still image of the model. To explore it in 3D, open this page in a current version of Chrome, Edge, Safari or Firefox with an internet connection.
Indicative numbers
These figures are indicative. Each rests on a published source or a stated assumption, and a feasibility study with a traffic count will replace them. Move the sliders to test your own view.
The regulator sets a dealer margin of K2.03 a litre on petrol and diesel, and an oil marketing company (OMC) margin of K2.68.2 Novea is its own OMC, so the group can earn both.
91 secure bays. The base case assumes K100 a night, about US$5. Truck parks at borders in the region charge US$10 to US$40 a day.12
The mini mart, coffee shop and bar are modelled as let space at US$10 per m² a month. Lusaka retail space is advertised at US$18 to US$36.11
The repair and tyre shop and the four wash bays are modelled as let to operators for US$2,700 a month in total. This is an assumption.
US dollars a year, converted at K20 to the dollar.10 Fuel income is the margin, not the pump price.
| Cautious | Base | Stronger |
|---|
Cautious uses a higher build cost of US$3.9 million. Stronger counts Novea's OMC margin, before Novea's own supply costs.
| Item | US$ million |
|---|---|
| Fuel forecourt, canopy, tanks, pumps and the mini mart A modern station in Zambia is put at US$1 to 2 million.9 | 1.60 |
| Repair and tyre shop and four wash bays Allowance. | 0.25 |
| Truck park, aisles and link road About 19,500 m² of heavy-duty paving at US$35 per m². Allowance. | 0.68 |
| Fence, lighting, power, water, drainage and driver ablutions Allowance. | 0.40 |
| Fees, approvals and contingency at 15% | 0.44 |
| Indicative build cost | 3.37 |
The allowances are placeholders for Kokeb's quantity surveyor to price. Land is held by Kokeb and is not in the figure.
Risks and open points
These are the points a partner should press on. Each has an owner and a next step in the feasibility work.
The plot is on the southbound side of the road. Whether northbound traffic can reach it depends on the median openings the Road Development Agency allows. The access design and its approval come first.
The fuel volume and bay occupancy in the model are not measured. A traffic count by vehicle class at the site will replace them.
The Energy Regulation Board sets pump prices and margins each month. The OMC margin moved from K2.25 to K2.68 a litre between December 2025 and September 2026, and it can move either way.2
The bays are at right angles to 12 m aisles, which is tight for a 22 m interlink, and the forecourt needs more room for articulated trucks to turn at the pumps. Swept-path design may change the number of bays.
The frontage boundary is to be confirmed by survey. Planning permission, environmental approval, the Energy Regulation Board's permits and the road authority's consent must be in place before construction.
Income is in kwacha, while much of the build cost is priced in dollars. The monthly average rate moved between roughly K18 and K23 to the dollar from December 2025 to June 2026, and was near K20 in early November 2026.10
Partnership
Kokeb has not fixed a structure and will shape it with the right partner.
A share in a project company that owns and runs the site.
A loan to the project, secured on the site and its income.
A partner to co-develop the site or to run part of it, such as the truck park, the shop or the workshop.
Kokeb Enterprises Limited
Plot 610/4AA, Zambezi Road, Foxdale, Lusaka
info@kokebenterprises.com · +260 97 409 4000
Sources
Site dimensions and areas are measured from the layout plan and the 3D model. Everything else is from the sources listed, or is marked as an assumption where it appears.
Important. This page is an information summary for prospective partners. It is not an offer or an invitation to invest. The financial figures are indicative and will be replaced by a feasibility study. Renderings are artist's impressions.