Investor report · Great North Road, Chisamba, Zambia

Chisamba Filling Station & Truck Park

A 4.87-hectare roadside plot on the Great North Road, planned as a Novea Energies fuel stop with secure parking for 91 trucks, a mini mart, a workshop and wash bays. Kokeb Enterprises Limited is seeking partners to build it.

Rendering of the proposed Novea Energies forecourt at Chisamba, with the six-lane fuel canopy, the mini mart and the repair and tyre shop
4.87 haplot fronting the Great North Road (T2)
91truck parking bays, 5 m wide
6fuelling lanes under a 28 m canopy
10,000+vehicles a day on the Lusaka to Ndola road3
US$3.4mindicative build cost, land excluded

The opportunity

A truck stop where the country's freight already passes

The Great North Road carries Zambia's traffic between Lusaka and the Copperbelt and on to the Congo border. Trucks on it need fuel, a safe place to stop overnight, food, tyres and a wash. This site offers all five on one plot that Kokeb already holds.

Fuel

Demand is growing

Zambia used 1.85 billion litres of diesel and 664 million litres of petrol in 2025, up 12% and 11% on 2024.1

Road

The road is being doubled

The 327 km Lusaka to Ndola road is being rebuilt as a dual carriageway under a US$650 million public-private partnership. Works were reported about 84% complete in July 2026.4

Freight

Copper drives the trucks

Copper output reached 890,346 tonnes in 2025, up 8%, against a government target of 3 million tonnes a year by 2031.8

What is proposed

A Novea Energies forecourt with three pump islands and six lanes, wide and high enough for trucks. Behind it sit a 525 m² mini mart with coffee shop and bar, a repair and tyre shop, four wash bays and a fenced park for 91 trucks. About 1.1 hectares at the back of the plot stays free for a later phase.

What Kokeb is looking for

Capital and partners to build and operate the site. Kokeb is open to equity, to debt or project finance, and to a joint venture or operating partner for parts of the site. No structure is fixed. Kokeb brings the land, the design, its own construction capacity, the Novea brand and fuel supply.

Location

On the T2 between Lusaka and Kabwe

The plot fronts the Great North Road (T2) at Chisamba in Central Province. The T2 is the trunk road from Lusaka to Kabwe and Kapiri Mposhi, where it meets the road to Ndola, Kitwe and the Kasumbalesa border with the Democratic Republic of Congo.

Freight from South Africa, Zimbabwe, Botswana and Namibia reaches the Copperbelt and the Congo through Lusaka and this road. Freight from Dar es Salaam joins further north, at Kapiri Mposhi.

The plot lies on the east side of the road, which on a dual carriageway is the southbound side, used by traffic heading for Lusaka. See the first point under Risks.

The site and the concept

342 metres deep, with the services at the road

The plot measures 342.1 m by 145.04 m. The forecourt, shop and workshop face the road. The truck park fills the middle of the plot, and the eastern end is kept for expansion.

Plan view of the site with north to the top. The Great North Road runs down the western edge. The fuel canopy, mini mart, workshop and wash bays stand in the south-west corner, the truck park fills the middle of the plot and trees cover the eastern end.

Swipe the plan sideways to see all of it.

  1. Fuel canopy: 3 islands, 6 lanes
  2. Mini mart, coffee shop and bar
  3. Repair and tyre shop
  4. Four wash bays
  5. Truck park: 91 bays
  6. Expansion land: about 1.1 ha
  7. Existing house
  8. Existing building
  9. Great North Road (T2)
Site layout from the 3D model, north to the top. A, B, C and D are the corner beacons of the plot.
ElementSizeArea or number
Plot342.1 × 145.04 m4.87 ha
Fuel canopy10 × 28 m, clear height 5.6 m3 islands, 6 lanes
Mini mart, coffee shop and bar15 × 35 m525 m²
Repair and tyre shop12 × 22 m264 m²
Wash bays5 × 22 m each4
Truck parking bays80 at 5 × 22 m, 11 at 5 × 18 m91
Paved area, including buildingsabout 2.55 ha
Landscaped areasabout 1.0 ha
Expansion land at the eastern endabout 1.1 ha

Renderings are artist's impressions prepared from the 3D model. Building heights, finishes, signage, fencing and vehicles are indicative.

3D model

Walk the site before it is built

The model is built to scale from the layout plan. Choose a view, or press Explore and drag to look around.

Drag to orbit · scroll or pinch to zoom · right-drag or two fingers to pan

Indicative numbers

Four income streams on one site

These figures are indicative. Each rests on a published source or a stated assumption, and a feasibility study with a traffic count will replace them. Move the sliders to test your own view.

1 · Fuel

Regulated margin per litre

The regulator sets a dealer margin of K2.03 a litre on petrol and diesel, and an oil marketing company (OMC) margin of K2.68.2 Novea is its own OMC, so the group can earn both.

2 · Truck parking

A nightly fee per bay

91 secure bays. The base case assumes K100 a night, about US$5. Truck parks at borders in the region charge US$10 to US$40 a day.12

3 · Shop and food

Rent from operators

The mini mart, coffee shop and bar are modelled as let space at US$10 per m² a month. Lusaka retail space is advertised at US$18 to US$36.11

4 · Workshop and wash

Rent from operators

The repair and tyre shop and the four wash bays are modelled as let to operators for US$2,700 a month in total. This is an assumption.

Assumptions

The average Zambian site sold about 171,000 litres a month in 2025.1 The base case is twice that, for a truck stop on a trunk road.
Share of the 91 bays in use on an average night.
In kwacha, per truck.
Staff, security, power, maintenance, insurance and licences. An assumption.
See the build-up below. Land is not included.
operating profit a year
yield on build cost
simple payback

Where the income comes from

Fuel, dealer margin
Fuel, OMC margin
Truck parking
Rents
Running costs

US dollars a year, converted at K20 to the dollar.10 Fuel income is the margin, not the pump price.

The terms, in plain words

Operating profit
Income left after running costs, before loan interest, tax and depreciation. Accountants call it EBITDA.
Yield on build cost
One year's operating profit as a percentage of what the site costs to build.
Simple payback
The build cost divided by one year's operating profit: the number of years of profit needed to repay the build.

The three cases

CautiousBaseStronger

Cautious uses a higher build cost of US$3.9 million. Stronger counts Novea's OMC margin, before Novea's own supply costs.

How the build cost is made up

ItemUS$ million
Fuel forecourt, canopy, tanks, pumps and the mini mart
A modern station in Zambia is put at US$1 to 2 million.9
1.60
Repair and tyre shop and four wash bays
Allowance.
0.25
Truck park, aisles and link road
About 19,500 m² of heavy-duty paving at US$35 per m². Allowance.
0.68
Fence, lighting, power, water, drainage and driver ablutions
Allowance.
0.40
Fees, approvals and contingency at 15%0.44
Indicative build cost3.37

The allowances are placeholders for Kokeb's quantity surveyor to price. Land is held by Kokeb and is not in the figure.

Risks and open points

What has to be settled before money moves

These are the points a partner should press on. Each has an owner and a next step in the feasibility work.

01Access from a dual carriageway

The plot is on the southbound side of the road. Whether northbound traffic can reach it depends on the median openings the Road Development Agency allows. The access design and its approval come first.

02Traffic and volumes are assumptions

The fuel volume and bay occupancy in the model are not measured. A traffic count by vehicle class at the site will replace them.

03Margins are regulated

The Energy Regulation Board sets pump prices and margins each month. The OMC margin moved from K2.25 to K2.68 a litre between December 2025 and September 2026, and it can move either way.2

04Truck layout needs engineering

The bays are at right angles to 12 m aisles, which is tight for a 22 m interlink, and the forecourt needs more room for articulated trucks to turn at the pumps. Swept-path design may change the number of bays.

05Boundary and approvals

The frontage boundary is to be confirmed by survey. Planning permission, environmental approval, the Energy Regulation Board's permits and the road authority's consent must be in place before construction.

06Currency

Income is in kwacha, while much of the build cost is priced in dollars. The monthly average rate moved between roughly K18 and K23 to the dollar from December 2025 to June 2026, and was near K20 in early November 2026.10

Partnership

Three ways in, and the structure is open

Kokeb has not fixed a structure and will shape it with the right partner.

Equity

A share in a project company that owns and runs the site.

Debt or project finance

A loan to the project, secured on the site and its income.

Joint venture or operator

A partner to co-develop the site or to run part of it, such as the truck park, the shop or the workshop.

What Kokeb brings

  • The landThe 4.87-hectare plot on the Great North Road.
  • The builderKokeb is an NCC Grade I contractor whose work includes heavy-duty pavements, workshops and industrial buildings.
  • The brand and the fuelNovea Energies is Kokeb's fuel brand. Kokeb holds an Energy Regulation Board oil marketing company licence, and a retail licence for its first Novea station, on Kansanshi Road in Solwezi.
  • The designA scaled layout, this 3D model and a concept design report.

Talk to us

Kokeb Enterprises Limited
Plot 610/4AA, Zambezi Road, Foxdale, Lusaka
info@kokebenterprises.com · +260 97 409 4000

Sources

Where the figures come from

Site dimensions and areas are measured from the layout plan and the 3D model. Everything else is from the sources listed, or is marked as an assumption where it appears.

Important. This page is an information summary for prospective partners. It is not an offer or an invitation to invest. The financial figures are indicative and will be replaced by a feasibility study. Renderings are artist's impressions.

  1. Energy Regulation Board, 2025 Annual Statistical Bulletin, February 2026: national consumption, retail sites, retail share of sales. The average per site is our calculation from those figures.
  2. Energy Regulation Board, pump price build-up, September 2026, and December 2025: OMC and dealer margins.
  3. Times of Zambia, report of the Minister of Transport and Logistics on the Ndola to Lusaka road, 2023.
  4. Soundscope Zambia, Lusaka to Ndola dual carriageway reaches 84%, 23 July 2026.
  5. Lusaka Times, Lusaka-Ndola Dual Carriageway Reaches 78 Percent Completion, June 2026.
  6. Freight News, Congestion continues at Copperbelt crossing, April 2025.
  7. Freight News, Meeting demand for well-maintained truck parks, 18 August 2022.
  8. Mining.com, Zambia's 2025 copper production up 8%, 2026.
  9. M&J Consultants, How to Open a Fuel Station in Zambia, 13 June 2025.
  10. Kwacha to US dollar rate: 30-day average of K20.00 to 4 November 2026; range from monthly averages.
  11. Pam Golding Properties, retail property to rent in Zambia, listings viewed November 2026.
  12. The Blast, parking fees at Chirundu Border Post, 14 October 2026.